Yd Series Pole-Changing Three Phase Induction Motor Induction Electric Motor

Yd Series Pole-Changing Three Phase Induction Motor Induction Electric Motor

Why pick us ?
CZPT MOTOR FEATURES  

CZPT motor body from fifty six – 355, output variety from .17HP to 430HP

Motor mounting variety B3 (IM 1001), B35 (IM 2001), B5 (IM 3001), B14 (IM 3601), B34 (IM 2101)

Optional voltage 110V, 120V, 220V, 240V, 220/380V, 230V/400V, 380V/660V, 50HZ or 60HZ

Protection type IP44, IP54, IP55 on request 

Several mounting arrangement for optional           
Aluminum body, conclude shields and base    

Strong forged iron frame
Higher energy cable
Shaft key and protector supplied        
Superior paint finish         
forty five# steel shaft and stainless steel shaft is optional
CZPT motor steady duty S1,S4
CZPT motor have vacuum impregnation for insulation
CZPT motor is class F insulation and class H insulation is optional
CZPT motor has been make according to CZPT, CE, UL, CCC, GS ask for

All of our goods are make in accordance to GOST, RoHS and IEC standard.

Large efficiency and IE1, IE2, IE3 efficiency  

 

OUR ELECRIC MOTOR FOR Customer Rewards

CZPTity preserving and tranquil operation
CZPT motor can withstand water, dust and vermin
CZPT motor really straightforward set up
CZPT motor trusted Corrosion resistant and long daily life to operate
Reliability performance and very competitive value.
 

HOW TO MAKE MOTOR ON JUAO Business

one. Silicon steel DR510, 800, 600, 360 standard use stamping of lamination stator and rotor die-casting

2. 100% copper winding and inserting stator (manual and semi-routinely)

3. Stator Vacuum impregnation and drying

4. CNC machining motor shaft, frame, finish shields, and so on

five. Specialist workman inspecting spare parts each processing

6. CZPT motor assembly product line

seven. CZPT motor will a hundred% examination prior to painting.

eight. CZPT motor spray-paint on motor portray product line

nine. CZPT motor will one hundred% check again prior to packing.

An electric motor from material to end motor, must pass 15 time verify, and one hundred% screening, output power, voltage, electric powered recent, non-load, fifty% load, seventy five% load, a hundred% load and verify the nameplate, packing. Last but not least delivery to our client.

Solution details 

            

YD series a few-stage double velocity motors is derived from Y2 sequence motor, it can change the speed
simply. The speed of YD series 3-phase double speed motors can be altered step by phase
in accordance to the requirements of load qualities, thereby reaching the aims of economizing on
electricity and simplifying the technique of pace variation.
Mounting way 
Parameter 

Sort

Output

Rated present

Rated speed

η

Power issue

Locked-rotor recent

Rated existing

Locked-rotor torque

Rated troque

Pull-out torque

Rated torque

KW

IN(A)

nN(rmp)

(%)

(cos Φ)

Tst/TN

Ist/TN

Tmax/TN

YD90L

.forty five

one.nine

seven hundred

58

.sixty three

1.5

5.5

one.eight

.75

one.ninety two

1420

72

.87

one.five

6.5

one.eight

YD100L

.eighty five

three.1

seven hundred

68

.63

1.five

five.5

one.8

one.five

3.5

1420

seventy five

.88

1.five

six.five

1.8

YD112M

one.5

five.

seven hundred

seventy five

.63

one.five

five.5

one.8

2.4

five.3

1420

seventy eight

.88

one.5

six.five

one.eight

YD132S

2.2

seven.

720

75

.64

one.5

5.5

1.eight

3.3

7.one

1440

80

.88

1.5

six.5

1.8

YD132M

three

9.

720

seventy eight

.65

one.5

5.5

one.8

four.5

nine.four

1440

eighty two

.88

1.5

six.5

1.8

YD160M

5

13.9

730

eighty three

.sixty six

one.5

five.five

1.eight

7.5

fifteen.2

1450

84

.89

one.five

six.five

one.8

YD160L

7

19.

730

eighty five

.66

1.five

five.five

one.eight

eleven

21.eight

1450

86

.89

1.5

six.five

one.eight

YD180L

eleven

26.

730

86

.seventy four

1.5

six

1.eight

seventeen

31.five

1470

87

.92

1.five

seven

one.8

YD200L1

14

33.

740

86

.seventy four

1.5

six

1.8

22

41.3

1470

88

.ninety two

one.5

7

1.eight

YD200L2

seventeen

40.one

740

87

.74

1.five

six

1.eight

26

48.eight

1470

88

.ninety two

one.five

7

1.8

YD225M

24

fifty three.2

740

89

.seventy seven

one.4

6

1.8

34

66.7

1480

88

.88

1.three

7

1.eight

YD250M

thirty

sixty four.nine

740

ninety

.seventy eight

one.4

6

one.8

42

seventy eight.8

1480

89

.ninety one

one.3

seven

one.eight

YD280S

40

83.five

740

ninety one

.eighty

one.4

6

1.eight

fifty five

102

1480

90

.ninety one

1.three

7

one.eight

YD280M

47

ninety six.nine

680

ninety one

.81

1.4

six

one.eight

sixty seven

122.nine

930

ninety

.ninety two

one.three

7

one.8

YD90S

.35

one.6

680

56

.60

one.4

6

one.8

.forty five

1.4

930

70

.seventy two

1.3

seven

1.eight

YD90L

.45

one.9

710

fifty nine

.sixty

one.5

five

1.8

.65

one.nine

950

71

.seventy three

1.5

6

1.8

YD100L

.seventy five

two.9

710

65

.60

1.five

5

1.8

one.one

3.1

950

75

.seventy three

1.5

6

1.8

YD112M

1.3

4.5

710

seventy two

.61

1.5

5

one.eight

1.eight

four.eight

950

78

.seventy three

one.5

6

one.eight

YD132S

one.8

five.eight

730

75

.sixty two

one.5

five

one.8

two.4

six.two

970

eighty

.73

1.five

six

1.eight

YD132M

two.6

8.2

730

seventy eight

.sixty two

one.5

five

one.8

three.7

9.four

970

82

.seventy three

one.five

six

one.8

YD160M

4.5

thirteen.3

930

eighty three

.sixty two

1.five

five

1.8

six

fourteen.7

980

eighty five

.73

1.five

6

one.8

YD160L

six

seventeen.five

930

eighty four

.sixty two

one.5

five

1.8

eight

19.4

980

86

.seventy three

1.5

6

one.8

YD180M

7.5

21.9

930

84

.62

one.5

five

one.8

10

24.two

980

86

.73

one.five

six

1.8

YD180L

nine

24.8

730

85

.sixty five

1.five

five

1.eight

12

28.three

980

86

.seventy five

1.5

six

one.eight

YD200L1

twelve

32.five

730

86

.sixty five

1.5

5

one.eight

seventeen

39.one

980

87

.76

one.5

6

one.8

YD200L2

15

forty.3

730

87

.65

one.five

five

1.eight

20

45.four

980

88

.76

1.5

6

1.8

YD100L

.75/1.3/1.eight

2.62/3.66/four.fifty three

940/1420/2880

sixty seven/72/seventy one

.sixty five/.seventy five/.eighty five

one.eight/1.six/1.6

5.5/six/seven

1.eight/one.eight/one.eight

YD112M

1.1/2/two.4

three.fifty two/5.fourteen/five.eighty

940/1440/2890

73/seventy four/74

.sixty five/.81/.eighty five

one.7/one.four/one.6

5.5/six/seven

1.eight/1.eight/one.eight

YD132S

one.eight/two.6/three

five.fourteen/6.ten/7.38

940/1440/2900

seventy five/seventy eight/seventy one

.71/.83/.87

1.4/1.three/one.seven

5.five/6/7

one.eight/one.eight/one.eight

YD132M1

two.2/3.3/4

six.03/seven.forty six/8.seventy nine

940/1440/2900

77/eighty/76

.72/.eighty four/.91

1.3/one.3/one.seven

5.five/six/seven

one.8/1.eight/one.eight

YD132M2

2.6/4/five

6.86/nine.04/ten.8

940/1440/2900

eighty/eighty/seventy seven

.seventy two/.eighty four/.91

one.5/one.four/one.7

five.5/6/7

one.8/one.eight/1.eight

YD160M

3.7/5/6

9.fifty two/11.two/thirteen.two

940/1440/2900

81/81/seventy six

.72/.84/.ninety one

1.five/1.three/1.four

five.5/six/seven

1.8/one.eight/1.8

YD160L

four.5/7/9

11.4/15.one/18.eight

970/1490/2930

eighty three/eighty three/seventy nine

.seventy two/.eighty five/.ninety two

one.5/1.21.3

5.5/six/seven

one.eight/one.8/one.eight

YD112M

.65/two/two.4

two.sixty six/5.14/five.eighty

910/1460/2930

59/74/seventy four

.sixty three/.81/.eighty five

one.four/1.three/one.two

four.5/6/7

one.eight/1.eight/1.eight

YD132S

1/two.six/3

3.16/six.10/7.08

710/1440/2900

sixty nine/78/74

.sixty one/.83/.87

1.4/1.2/one.four

4.5/6/seven

1.8/one.8/one.8

YD132M

one.three/3.seven/4.five

4.fifty six/eight.37/ten.

710/1440/2900

71/eighty/seventy five

.61/.eighty four/.ninety one

1.five/one.3/1.four

four.5/6/7

one.eight/1.8/1.eight

YD160M

two.2/five/six

seven.55/eleven.two/13.two

710/1440/2900

75/eighty one/76

.59/.84/.91

1.4/one.three/1.four

4.5/six/7

one.eight/one.eight/one.8

YD160L

two.eight/seven/nine

nine.21/15.ten/18.80

720/1460/2930

77/eighty three/79

.sixty/.eighty five/.ninety two

1.3/1.two/1.three

5.5/six.five/seven

1.eight/one.eight/one.8

YD112M

.eighty five/one/one.5

three.seventy two/3.06/3.fifty three

710/940/1400

sixty two/sixty eight/seventy five

.fifty six/.seventy three/.86

one.4/one.two/1.4

5.5/6.5/7

1.eight/one.eight/1.8

YD132S

1.1/one.5/one.8

4.ten/4.22/four.03

710/940/1440

68/74/78

.sixty/.73/.87

1.four/1.three/1.3

five.5/6.5/seven

1.8/one.eight/one.eight

YD132M1

one.five/two/2.2

5.18/five.41/4.87

710/940/1440

seventy one/seventy seven/79

.62/.37/.87

one.three/1.5/1.4

5.5/6.five/seven

1.eight/one.8/one.8

YD132M2

one.8/two.six/three

6.13/six.eighty four/6.fifty five

710/940/1440

seventy two/78/eighty

.sixty two/.seventy four/.87

1.5/1.five/one.5

5.5/six.5/seven

1.eight/one.eight/1.eight

YD160M

three.3/4/five.5

10.2/nine.87/11.six

720/970/1460

seventy nine/eighty one/83

.62/.seventy six/.87

1.7/1.four/1.five

five.5/6.5/seven

1.8/one.eight/one.eight

YD160L

four.5/six/7.five

13.8/14.5/fifteen.6

720/970/1460

eighty/eighty three/84

.62/.seventy six/.87

one.6/one.six/one.5

five.five/six.five/seven

one.8/1.8/1.8

Connection method 

FAQ 

Q1: What about the shipping and delivery strategies?

1): For urgent get and gentle fat, you can select the subsequent categorical: UPS, FedEx, TNT, DHL, EMS.

 For weighty excess weight, you can choose to deliver the merchandise by air or by sea to conserve expense.

Q2: What about the payment strategies?

A2: We acknowledge T/T, L/C for large quantity, and for little volume, you can pay out us by PayPal, Western Union etc.

Q3: How much does it price to ship to my place?

A3: It is dependent on seasons. Price is different in different seasons. You can consult us at all times.

This fall: What’s your supply time?

A4: Normally we generate in twenty five-30days following the payment arrived.

Q5: Can I print our logo/code/collection quantity on your motor?

A5: Indeed, of training course.

Q6: Can I order some sample for our testing?

A6: Sure, but it requirements some costs.

Q7: Can you customize my item in special need?

A7: Yes, we can provide OEM.

Yd Series Pole-Changing Three Phase Induction Motor Induction Electric Motor

Leave a Reply

Your email address will not be published. Required fields are marked *