F sequence Parallel Shaft-CZPTcal Geared Motor Characteristics
1.Functions:
- Higher efficiency: 92%-94%
- Parallel output, compact structure, massive output torque, sleek procedure, minimal noise and lengthy services existence.
- Higher precision: the gear is created of higher-top quality alloy steel forging, carbonitriding and hardening therapy, grinding procedure to make certain substantial precision and stable working.
- Higher interchangeability: extremely modular, serial style, robust versatility and interchangeability.
2. CZPT parameters
Ratio | three.77-276.77 |
Enter power | .12-200KW |
Output torque | three.5-21700N.m |
Output pace | 5-352rpm |
Mounting variety | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange enter(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
Brake Release | HF-manual release(lock in the brake launch situation), HR-guide launch(autom-atic braking placement) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Type | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 high-power cast iron from R37,forty seven,57,sixty seven,77,87 |
Housing substance | HT250 Higher energy forged iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
Performance | 92%-ninety four% |
Lubricant | VG220 |
Protection Course | IP55, F class |
CZPTshine Push
ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a point out-owned armed forces mould company, was established in 1965. CZPTshine specializes in the comprehensive energy transmission remedy for higher-finish gear manufacturing industries dependent on the aim of “System Solution, Application Design and style and Professional Support”.
CZPTshine have a strong technical force with above 350 workers at current, like above thirty engineering specialists, thirty high quality inspectors, covering an area of 80000 square meters and varieties of sophisticated processing devices and screening equipments. We have a good basis for the sector software improvement and services of large-conclude velocity reducers & variators proudly owning to the provincial engineering engineering analysis heart,the lab of equipment velocity reducers, and the base of contemporary R&D.
Our Team
High quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
All our goods get ISO & CE & UL certification.
Packing
Shipping and delivery